NYC Admin Code Title 28, Article 303 (§§ 28-303.2, 28-303.2.1, 28-303.7); 1 RCNY § 103-01
Article 303 of Title 28 of the NYC Administrative Code requires each boiler to be inspected at least once a year, with low-pressure boilers receiving an annual external inspection and an internal inspection where the boiler's construction allows (§§ 28-303.2, 28-303.2.1). The inspection must be performed by a qualified boiler inspector hired by the owner, and the owner must file the signed annual inspection report with the Department within 14 days after the inspection (§ 28-303.7; 1 RCNY § 103-01). Failure to file or late filing carries civil penalties (e.g., $50/month per boiler late, up to $600, and $1,000 per boiler for failure to file).
1 RCNY § 101-06
1 RCNY § 101-12
Americans with Disabilities Act Title III, 42 U.S.C. § 12181 et seq.; 28 C.F.R. Part 36 (2010 ADA Standards for Accessible Design)
Local Law 157 of 2016, as amended by Local Law 102 of 2025 (Int. 1281-2025); NYC Admin. Code §28-315.2.4 / §27-2045 — natural gas detecting devices
Local Law 26 of 2004 (amending NYC Administrative Code / NYC Building Code)
Local Law 26 of 2004 (NYC Admin. Code 28-315.2 et seq.)