15 RCNY Chapters 19.1 and 31 — Unified Stormwater Rule
DEP's Unified Stormwater Rule, adopted in 2022, amended Title 15 RCNY Chapter 19.1 (stormwater construction permitting) and Chapter 31 (house/site sewer connection proposals) to extend stormwater performance and construction-permit requirements—previously limited to the MS4 storm sewer system—to development discharging to the combined sewer system as well. It applies to development that disturbs 20,000 sq ft or more of soil or creates 5,000 sq ft or more of new impervious surface, requiring covered projects to submit a Stormwater Pollution Prevention Plan (SWPPP) and obtain a stormwater construction permit before beginning work. The Chapter 31 amendments do not apply to sites with a sewer availability certification issued before February 15, 2022.
15 RCNY Chapter 1 (Asbestos Control Program); NYC Admin. Code Title 24, Subchapter 5 (Asbestos)
40 CFR Part 61, Subpart M (§ 61.145) — National Emission Standard for Asbestos (NESHAP)
6 NYCRR Part 613 — Petroleum Bulk Storage
NYC Admin. Code § 24-168.1 (Clean heating oil)
NYC Admin. Code §§ 24-109, 24-120, 24-122 (Air Pollution Control Code, Title 24, Ch. 1); annual tune-up/combustion-test requirement per Rules of the City of New York Title 15, § 2-09
NYC Admin. Code Title 24, Ch. 1, Subch. 8 (Fuel Standards), § 24-168, as amended by Local Law 32 of 2023